WAC 296-46B-230 Services.
095 Ground-fault protection of equipment.
(12) Equipment ground-fault protection systems required by the NEC® must be tested prior to being placed into service to verify proper installation and operation of the system as determined by the manufacturer's published instructions. This test or a subsequent test must include all service voltage feeders unless the installer can demonstrate, in a manner acceptable to the department, that there are no grounded conductor connections to the feeder(s). A firm having qualified personnel and proper equipment must perform the tests required. A copy of the manufacturer's performance testing instructions and a written performance acceptance test record signed by the person performing the test must be available for the inspector at the time of inspection. The performance acceptance test record must include test details including, but not limited to, all trip settings and measurements taken during the test.
In Washington, which of the following is true?
Please register or sign in for electrical continuing education courses. If you were already signed in, your session probably expired, please sign back in. |