In rare occurrences, an alternate method of construction may be needed that is not mentioned in the applicable code. Even though these alternate methods may not be in the Electrical Code, they may be able to meet the intent of what the NEC® is trying to accomplish.
The State Building Codes Division makes rulings on the acceptability of using alternate materials or methods of construction. These rulings are called Electrical Statewide Alternate Methods (SAMs) and are located here at the States website: Oregon Alternate Methods
To date, there are four alternate methods posted on the site for the electrical trade:
08-02 Underground Splicing of Equipment Grounding Conductors for Traffic Signal Installations.
08-03 NMB cable in outdoor conduit sleeves. (Rescinded)
09-01 Electric Vehicle Charging Equipment Services and Feeders.
22-01 Electrical Vehicle Supply Circuit GFCI Protection for Personnel
The rules below pertaining to alternate methods can be found here: Chapter 918 Division 8, 918-008-0095
918-008-0095 Alternate Method Ruling Process.
(1) A petitioner may request an alternate method ruling by providing the following information in writing or on division approved forms:
(a) Information on the material, design, or method the person wishes to utilize;
(b) The specialty code section at issue; and
(c) A brief description of the technical and scientific facts and circumstances giving rise to the need for an alternate method ruling.
(2) Notwithstanding subsections (1)(a) through (c) of this rule, the division may elect to accept a substantially complete request for an alternate method ruling if circumstances merit.
(3) After receipt of a petitioner's complete request for interpretation, the appropriate advisory board makes a recommendation on the technical and scientific facts of the proposed alternate method ruling, consistent with ORS 455.060.
(4) After considering the recommendation of the appropriate advisory board, the division makes the final decision on the alternate method ruling and distributes the decision consistent with ORS 455.060.
When requesting an alternate method ruling, which of the following is true?